The Number That Explains This Place

On 19 August 2007 the official rainfall total recorded at Altura was 11.45 inches. It was among the highest official readings taken anywhere in Winona County during the largest rainfall event in Minnesota history.
For context, in southeastern Minnesota roughly 7.75 inches over 24 hours is considered a 100 year storm, meaning a one percent chance of occurring in any given year. Altura took nearly half again that much. Nearby Elba was evacuated, along with the campgrounds at Whitewater State Park.
What Those Numbers Do To A Building
| Rainfall in 24 hours | Classification | What happens locally |
|---|---|---|
| 2 to 3 inches | Heavy rain | Sump pumps run continuously. Poorly graded lots take water at window wells. |
| 4 to 6 inches | Significant event | Upland soil approaches saturation. Ditches and culverts run full. |
| 7.75 inches | 100 year storm | Soil stops absorbing. Runoff concentrates in the valleys. |
| 11.45 inches | Altura, 19 August 2007 | Valley evacuations, road and bridge failures, widespread structural flooding. |
The important line is the third one. Once upland soil is saturated it absorbs essentially nothing further, and every additional inch becomes runoff. That is why totals above about eight inches produce damage that is not proportional to the rainfall. The system does not degrade gradually. It stops working.
Whitewater Valley Properties
Altura sits at the top of the Whitewater country, with the state park and Elba to the north. Properties in and around the valley include year round homes, farm operations and seasonal buildings.
Seasonal buildings produce the worst losses we handle anywhere in the county, and the reason is simple: nobody is there. A supply line that fails in a closed cabin in February runs until someone opens the door in April. At that point the question is not drying, it is what can be saved and whether the structure is sound.
If you own a property here that sits empty for part of the year, shut the water off at the main and drain the lines when you leave. It costs nothing and it is the most effective prevention available.
How We Handle An Altura Call
The contractor establishes the water source and category first. Upland groundwater, valley flood water and a failed appliance are three different jobs and the wrong protocol wastes both time and material.
Moisture mapping follows across every affected building, then extraction, containment and structural drying sized to the actual space. Readings are logged daily against a dry standard from an unaffected area, and equipment stays until the numbers match rather than until the schedule says so.
Where a building has been wet for weeks, mold is established and the job starts as mold remediation.
Call (507) 698-9249 for Altura, Elba and the Whitewater valley.